HN user

mrbn100ful

281 karma
Posts9
Comments41
View on HN

Yes and most people don't realize that the current "AOSP" apps are the LineageOS apps.

A true AOPS image is missing most core Apps.

How is it nowadays ?

I can't find recent demos of the phone, everything is a few years old on YouTube now, and I know the device is still in development.

How usable the browser and camera are ?

Can you get a full day of battery ?

https://forum.sailfishos.org/t/jolla-c2-out-of-stock/27573/5

Let us clarify here as it is very different indeed.

The Jolla C2 Community Phone is done in collaboration with Reeder, who is the HW vendor. This means Reeder sources the components, plans the production and does the manufacturing in Turkey. Jolla provides the complete software stack (Sailfish OS) which is installed by Reeder in the manufacturing.

In the new Jolla Phone everything is different. Jolla is the vendor, has designed the product itself, done the component sourcing and pays directly to the component vendors. We control the pipeline. Further, we have secured our position for the initial memory batch with advance purchase.

Also, to be clear: Reeder has no involvement in the new Jolla Phone.

Thank you for asking, very good points to clarify!

499usd for a refurbished pixel 8 and a custom rom ?

You can get a punkt phone, which does the same thing for a cheaper price, with custom hardware and a cool eink screen.

Let's have a quick look:

Qwant France EU Hosting

Sure, but the search engine behind is monstly Bing.

Startpage Netherlands EU Hosting

Use Bing and Google

Ecosia Germany EU Hosting

Use Bing, Google Yahoo and Wikipedia

This is not how you build alternative platforms.

The only true Independents search engine are Brave Search and Kagi both from the US.

The EU can't compete, we are lagging behind.

"Resulting in a Level 2 event on the International Nuclear Event Scale."

A level 2 on the INES is an Incident. A major Accident would be a level 7.

A level 2 is not that bad : Impact on people and environment: Exposure of a member of the public in excess of 10 mSv. Exposure of a worker in excess of the statutory annual limits. Impact on radiological barriers and control:

Radiation levels in an operating area of more than 50 mSv/h. Significant contamination within the facility into an area not expected by design. Impact on defence-in-depth:

Significant failures in safety provisions but with no actual consequences. Found highly radioactive sealed orphan source, device or transport package with safety provisions intact. Inadequate packaging of a highly radioactive sealed source.