HN user

ComradeTaco

958 karma
Posts1
Comments104
View on HN

Most large infrastructure projects have a large number of trades for a short amount of time Contractors have people,experience and equipment that would be cost prohibitive to maintain full time but can be relatively inexpensive when hired for just their needed duration.

The kinds of work that you describe fall more under maintenance and basic repair, which most public agencies have full time employees that perform that roles. For instance the NYC subway has signaling workers for a constant stream of signal work, track workers to maintain track and sign workers for endless lifecycle replacement of signs. New construction work, like tunnels and stations is done by contractors.

There is a non-zero chance that May is replaced by a hard brexiter and they insist, by will of the referendum, that a hard brexit must occur. You can see UKIP bubbling back up in frustration.

When you consider what a soft brexit is, it's genuinely nothing of what leave wanted. The UK still doesn't have a solid border between itself and the EU because of the Good Friday Agreement, the UK still had to pay the EU and follow it's regulations and for all that it gets zero say in the EU legislature.

So there is a real chance of a hard brexit and it's going to be very messy.

Okay, my bachelors was in civil engineering and I have worked in construction and engineering for just over two years now.

Most public projects today have generous structured incentives that are given to companies for meeting goals for time and budget. We work to these incentives.

Keep in mind that often you cannot be aware of the things that will go wrong until you actually do them. This happens in software development quite a bit.

I am not aware of any extensive private tunnel construction that has occurred without public financing inside of the U.S.

So here are the drawbacks to Musk's plan:

1. He may prioritize speed over safety, either unintentionally causing loss of life or limb because of construction practices or geotechnically destablize the foundations of the buildings and infrastructure that he's traveling under.

2. I firmly believe that it's going to cost far, far more than 1 billion. That leaves the chance of a big hole in the ground that may eventually fill with water.

A boring machine that could dig 10x as quickly (and hold all other desirable characteristics equal) would save tens of billion of dollars in infrastructure projects around the world and substantially increase the financial viability of tunneling globally. It would totally transform the sector, much more profitability and meaningfully than these tunnels will change transportation.

If your goal was to cut costs and your largest single expense was boring, you would choose two 14' bores over a single 28' bore, because a 28' bore has a cross section twice as large as the combined cross section of two 14' bores and variable costs for boring are roughly based on cross sectional area

One of the only things that I can agree with Musk in regards to this project is that larger tunnels are more expensive.

Ahh, I appreciate the correction!

I thought they were going to have a single track tunnel with passing sidings based on the 1.6 billion dollar construction costs, which would limit frequency.

Does Musk seriously believe he get two ~20 mile tunnels and terminals for $1.6 billion? I don't know if he's exceedingly ambitious or delusional, give that a underground that's depicted in the rendering would cost 1/4 of his budget.

If I attempted to buy an ice cream cone with Bitcoin, will the money be transferred before the ice cream melts?

It will not.

What costs more, the transaction fees or the ice cream cone?

There have been times where the average transaction cost was about $20. It's hovering around $0.80 cents now, to the best of my knowledge. So it depends on the market.

I belief that the current strategy is to convince others that bitcoin is a great transaction medium for everything under the sun (i.e. ice cream) and then cash out in dirty fiat once the price reaches a target so you can buy Lambos full of ice cream. It's really not a sincere attempt to create a currency as it is to masssively enrich early adopters by encouraging use by normal people.

Right, there is a real and serious problem with public infrastructure costs massively ballooning, worse than any other developed country.

But on the other hand, if you don't build and replace infrastructure now, you're going to have tons of problems that have real, tangible costs. Imagine you're a patient with a disease, but you don't have health insurance and you know the cost is for treatment is high. You wait several years to get treated but the cost for treatment hasn't changed or is higher and you've suffered all that time.

That's our conundrum. We can choose to not treat the disease and that's been the choice of a fair number of public officials but it's only cost us.

Generally, if you're serious about getting people were they need to be quickly, you use light rail technology and principles.

Streetcars, in the sense that they're being implemented in North America are no faster than buses in mixed traffic. What they mostly lend is the idea of permanently high frequency transit, which is a positive sign for developers although not as useful for residents as light rail.