They won't send any maps, they will just come out and mark their underground utilities before you dig.
HN user
shambolic
Wireless point-to-point links are comparatively cheap, but require clear line of sight, uncontested spectrum and power. Sometimes you have none of those. Wireless also scales poorly past 1 Gbps.
Fiber is more expensive up front, but cheaper in the long run if your bandwidth requirements grow. Fiber also does not become obsolete, like wireless equipment.
Which benefits do you need that a CLEC has but a BIAS does not?
If you can guarantee a rate of return, getting money from any bank sounds easy.
Sadly this isn't true. Banks lend you money if you have collateral.
And if take rate is 60%, then those that take the offer have to pay 100%/60%=166% of what they would have payed with a 100% take rate.
That only works if the customers are willing to pay 166%. The shit really hits the fan if you get the take rate wrong and your costs exceed what your customers have agreed to pay.
The Brand X decision killed local loop unbundling in the US. So unless you own the copper plant this is a no-go. If you are outside the US, even then there are problems as access to subloops can be hard to get.
Well, unless you bury your wires, sooner of later somebody is going to find out you did the dirty deed. Then all they have to do is follow the cable to your house and fine you.
What do you need the GPU for? The box does not appear to have a display.
Yes. There are various options from Layer 1 encryption to VPNs.
No, we don't. The Brand X decision killed unbundling for DSL.
No, it is not possible.
Unless you plan to do this purely on private property, you are going to have to negotiate and pay for access to public right of way.
Also, even if you only did this on private property and did not cross any roads or other public spaces, you'd be SOL if your neighbor wasn't a node and they didn't feel like giving you permission to cross their property.
I'd also guess that passing through a node might cause some slowdowns that kinda stack up.
Not really. Fiber has bandwidth to spare. It might add some latency tho, if there are a lot of hops.
There still is a major privacy issue with peeps that are nodes.
Encryption is a thing.
And maintenance is going to be a bitch.
Yes.
You don't have to be a CLEC to access right of way, including ducts and poles. It's enough to be a BIAS (Broadband Interner Access Provider), which you already are.
Or you could just use an IRC channel...
The biggest problem is: where is the money going to come from?
Even if you guarantee a rate of return, somebody still needs to finance the buildout.
Second issue is, how will infrastructure that is installed, but not used be paid for? Take rate is rarely 100%, so who is going to pay for that part and how?
Jeez, that's rough. Sounds like a great recipe to drive away investment and for only installing 2" conduit to the detriment of all.
What happens when you go to their offices?
How do you know the duct rent if you haven't been able to contact the utility?
$7/ft is more than you should be paying. Get some more competing quotes.
I'd be very surprised if you can hit $30-40k per mile all in when microtrenching.
we tried relentlessly to contact our local utilities to gain access to their underground conduit and was never able to get someone on the phone or even much of a response.
I find that really hard to believe. Go to their offices and ask for the manager.
I eventually got to the point where I was like, "Fk it, I'll do it on my own." Now we're looking at microtrenching, which is probably an even larger endeavor, but at least we'll own the conduit.
Building your own facilities is no joke. Unless you are made out of money, you'll be far better off putting more effort into renting existing ducts.
The fraud and racketeering charges are a sham, manufactured to work around the non-extraditable copyright infringement charges.